The 250-line cap applies to prose too, and the reports were the worst
offenders -- ENUME's projectA.tex alone was 1,876 lines. Each is now a
preamble plus one \input{} per section, which is how a long LaTeX document is
normally organised; not one byte of prose was rewritten.
"The PDF is unchanged" is checked by a script rather than by eye, because
hashing the PDF cannot work: pdflatex stamps a /CreationDate and an /ID into
every build, so two runs of the SAME source already differ. tex_fingerprint.sh
compares what a reader sees instead -- page count plus a hash of the extracted
text -- and it is stable across rebuilds of untouched sources, which is the
property that makes it usable as a gate.
It earned its keep immediately. Both ECOTE reports quote an example LaTeX
document inside an lstlisting block, so \end{document} appears in the middle
of the file; splitting on the FIRST one stranded everything after it. Same
page count, different text, caught automatically. EOPSY lab3 exposed a second
bug: a \section{} title that runs onto the next line.
Result: 19 .tex over the cap -> 1. The survivor,
ELAC/.../03-building-nfa-...tex, is 418 lines of consecutive tikz figures
with no subsection to split on and needs a hand-placed boundary.
Verified: 29 splits across two passes (section, then subsection for the
pieces still over), every one reporting `unchanged` from
scripts/tex_fingerprint.sh --check.
Co-Authored-By: Claude Opus 5 (1M context) <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_0172dj34FDpao6wsix8ZuCzE
97 lines
2.8 KiB
TeX
97 lines
2.8 KiB
TeX
\section{Ograniczenia}
|
||
\subsection{Ogólne}
|
||
Przepływ musi być nieujemny oraz mniejszy przepustowości
|
||
\begin{equation}
|
||
0 \leq f_{ij} \leq u_{ij}, \qquad (i,j) \in N \\
|
||
\end{equation}
|
||
Wszystko co przypłyneło do stanu k musi stamtąd "odpłynąć"
|
||
\begin{equation}
|
||
\sum_{i \in N \backslash \{z\}} f_{ki} = \sum_{i \in N \backslash \{W\}} f_{jk}, \qquad k \in N \backslash \{z, W\}
|
||
\end{equation}
|
||
|
||
\subsection{Dostępne surowce}
|
||
Nie możemy kupić więcej surowca S1 niż jest dostępne
|
||
\begin{equation}
|
||
f_{zS1} \leq 12000
|
||
\end{equation}
|
||
Nie możemy kupić więcej surowca S2 niż jest dostępne
|
||
\begin{equation}
|
||
f_{zS2} \leq 8000
|
||
\end{equation}
|
||
|
||
\subsection{Koszt zakupu surowców}
|
||
Nie możemy kupić mniej niż 0 surowców
|
||
\begin{equation}
|
||
a_1 \geq 0
|
||
\end{equation}
|
||
\begin{equation}
|
||
a_2 \geq 0
|
||
\end{equation}
|
||
\begin{equation}
|
||
b_1 \geq 0
|
||
\end{equation}
|
||
\begin{equation}
|
||
b_2 \geq 0
|
||
\end{equation}
|
||
Ograniczamy ile ton ponad dany limit kupiliśmy
|
||
\begin{equation}
|
||
a_1 \leq f_{zS1} - 2387
|
||
\end{equation}
|
||
liczba powyżej 2056 ton
|
||
\begin{equation}
|
||
a_2 \leq f_{zS1} - 6659
|
||
\end{equation}
|
||
liczba powyżej 2056 ton
|
||
\begin{equation}
|
||
b_1 \leq f_{zS2} - 2090
|
||
\end{equation}
|
||
liczba powyżej 2056 ton
|
||
\begin{equation}
|
||
b_2 \leq f_{zS2} - 4349
|
||
\end{equation}
|
||
\subsection{Transport surowca S1 do przygotowalni}
|
||
wagon może przetransportować maks. 18 ton surowca S1
|
||
\begin{equation}
|
||
b_{P1} \geq [\frac{ f_{S1, G1} }{18}]
|
||
\end{equation}
|
||
\subsection{Transport surowca S2 do przygtowalni}
|
||
ciężarówka może przetransportować maks. 25 ton surowca S2
|
||
\begin{equation}
|
||
c_{P2} \geq [ \frac{ f_{S2, P2} }{ 25 } ]
|
||
\end{equation}
|
||
\subsection{Praca przygotowalni}
|
||
Przygotowalnia nie może mieć więcej surowców niż przepustowości
|
||
\begin{equation}
|
||
\sum_{i \in N, p \in P} f_{ip} \leq 16000
|
||
\end{equation}
|
||
ilość półproduktów w zależności od surowca
|
||
\begin{equation}
|
||
(\sum_{i \in N} f_{ip}) m_{pd} = f_{pd}, \qquad i \in N, p \in P, d \in D
|
||
\end{equation}
|
||
\subsection{Koszt pracy przygotowalni}
|
||
3 pracowników może obsługiwać maksymalnie 150 ton całkowitej ilości przerabianych surowców
|
||
\begin{equation}
|
||
l \geq [ \frac{ \sum_{i\in N, p \in P} f_{ip} }{150} ]
|
||
\end{equation}
|
||
\subsection{Transport S2 do zakładu obróbki cieplnej}
|
||
ciężarówka może przetransportować maks. 25 ton surowca S2
|
||
\begin{equation}
|
||
c_{O2} \geq [\frac{ f_{S2, O2} }{25}]
|
||
\end{equation}
|
||
\subsection{Praca zakładu obróbki cieplnej}
|
||
ilość surowca S2 w zakładzie obróbki cieplnej nie może być większa od 6000
|
||
\begin{equation}
|
||
f_{S2, O2} \leq 6000
|
||
\end{equation}
|
||
\subsection{Minimalna dostarczona ilość wyrobów}
|
||
Zgodnie z umową musimy dostarczyć przynajmniej 5000 ton wyrobów
|
||
\begin{equation}
|
||
\sum_{i \in N f_{iw}} \geq 5000, \qquad w \in W
|
||
\end{equation}
|
||
\subsection{Maksymalna liczba wagonow}
|
||
Na jedna lokomotywę, nie może przypadać więcej niż 12 wagonów
|
||
\begin{equation}
|
||
12wl \geq c_{P1}
|
||
\end{equation}
|
||
|