Commit Graph

1 Commits

Author SHA1 Message Date
5390f2043c Add CI-mirror pre-push gate + requirements-sync check
Some checks failed
pre-commit / pre-commit (push) Has been cancelled
Tests / test (3.10) (push) Has been cancelled
Tests / test (3.11) (push) Has been cancelled
Tests / test (3.12) (push) Has been cancelled
Keeps CI green by closing the local↔CI gap that caused this session's
red runs: the installed pre-commit hook only checks staged files and the
dev env already has every dep, while CI runs `pre-commit run --all-files`
and installs a fresh env from requirements.txt.

- scripts/check_requirements_sync.py: static hook (pre-commit stage) that
  AST-scans the package's third-party imports and fails if any isn't
  declared in requirements.txt — the exact ModuleNotFoundError class that
  reddened three repos. Fast, runs at commit time.
- scripts/ci_mirror.sh: pre-push gate that reproduces both CI workflows —
  a requirements.txt-only venv (hash-gated, rebuilt only when
  requirements.txt changes) running `pre-commit run --all-files` +
  `pytest`. Replaces the old pytest-coverage pre-push hook (subsumed by
  the clean-venv pytest). A red result blocks the push; `git push
  --no-verify` overrides.
- .ci-mirror-venv/ gitignored; pre-push hook installed.

Verified: mirror runs green (747 passed, 100% cov); dep-sync check
catches a removed crdt-sync; hash-gate reuses the venv on repeat runs.

Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_018PMRRVVkeRyrSaaqueMZKG
2026-07-11 17:42:45 +02:00